Ürün No. 480501
Tape VF-250
Çift taraflı dokusuz yüzey kaplamalı, nitril kauçuk esaslı, yüksek kaliteli, birinci sınıf yalıtım bandı
Ürün varyantları
İndirilebilir Dökümanlar
Teknik Özellikler
Uygulama Alanları
- Interior and exterior use
- Waterproofing in the transition to water impermeable concrete constructions (PG-FBB testing principles)
- Waterproofing in a bond
- Plinth waterproofing
- Connection and integration of flexible polymer-modified thick coatings with non-mineral building materials and connection areas such as plastic, metal and wood
- Waterproofing in contact with the ground
- Secure and water-tight sealing of internal corners and joints
- Connection to adjoining building elements
- Connection to non-mineral building elements
- Application in conjunction with crack-bridging, mineral waterproofing slurries and flexible, polymer-modified thick coatings
Özellikler
- Highly flexible
- High expansion capability and elastic recovery
- Special non-woven fabric coating
- Substrate requirements: Clean, dust-free and capable of supporting a load.
- Preparations: Remove projecting seams and mortar remains. Remove gravel packets and fill cavities. Clean non-mineral substrates until they are free from residues and degrease; roughen if necessary. Create a scratch coat of waterproofing material on mineral and roughened substrates. Refer to the current Technical Data Sheet for detailed information on the single products.
- Apply waterproofing material as contact layer, work in Water Stop over the entire surface. Depending on the waterproofing product used, the 2nd and 3rd layer of waterproofing is applied over the entire surface.
- The permissible application temperatures depend on the product properties of the waterproofing products used. Apply the waterproofing material crosswise in relation to the tape. The tape must not be damaged.
- For cutting: scissors or knife For sealing: roller, wide brush or scraper Clean tools with water while the material is still fresh.

- Virtually unlimited when stored dry at room temperature and protected from direct sunlight.
- According to needs
- The current technical regulations must be observed. Current regulations and legal requirements must be taken into account and deviations from these must be agreed separately. The relevant test certificates must be observed when planning and carrying out work. Always set up a trial area/trial areas first.
- The product must be disposed of in accordance with the official regulations.